Government-required fence is taking shape.

Pebbles and moram arrived for making the concrete.
They constructed 50 forms. 140 wooden pillars are needed.
It takes 3 days for the cement to harden in the form.

Beginning the construction of the school main entrance. There will be a required gate with brick walls on either sides of the gate. The rest of the perimeter of the grounds will be a fence.

Our welder, Hamimu Macha, has been working at our school from the very beginning. He literally has made everything, that is made from steel, at our school!
This will be the school gate . Hamimu Macha will be fabricating the school gates.
Starting to work on the gate. I will be excited to see how it turns out!

2019 Garden Party Photo album

This was a big hit! We had so many wonderful donated items that everyone was a winner!
My husband Paul, three sons, Joseph, David and Erik, along with and my bassoon son’s teacher, Matt, provided us the cake walk music!
The food was not catered! We did it together as a joint family and friend effort!
There were 110 people in attendance!
Pamrell Larsen drove from Milwaukee to attend the party!

I gave each person at the party a “quiz” and and answers on the quiz came from these informational sheets on the tables.