January rains have made the school roads very bad, and our school yard a muddy mess.

More truck loads of rocks are needed for the road and the school grounds. Each truck load costs $150. We need at least 6 loads of rocks.

The school environment will someday look much better. We have hopes and dreams to make it look very beautiful and not be all mud and rocks!

The rainy season is challenging! There is so much mud that is brought into the classroom.